Power Plant w/ G.E. LM6000 Natural Gas, 46 MW GENERAL ELECTRIC LM6000 PD Sprint

energy & engines: power generators, engines, turbines, boilers / turbines

Manufacturer: GENERAL ELECTRIC

Model:LM6000 PD Sprint

Type of machine: Power Plant w/ G.E. LM6000 Natural Gas, 46 MW

item-No.: 162752950

Quantity: 1

Date: 30.09.2026

Year of manufacture:

Location: Land-us USA 33525 Dade City

Price:

Your price suggestion:

Machine in stock:Yes

GE LM6000 PD Sprint, 46MW, 11,500v. 50 Hz. Natural Gas Turbine-Generator
One (1) Complete Power Plant with an GE LM6000 PD Sprint, 46 MW ISO, 11,500v. 50 Hz. Cogeneration, Natural Gas Turbine Generator.

Equipment Description
Gas Turbine Generator Set: 2009 Manufactured/2021 engine exchanged - GE LM600 PD Sprint Triple annular combustor

Condition: Engine exchanged by GE in March 2021 with factory refurbished unit. Last GE borescope (Dec. 2024) released the engine for operations, nevertheless, the engine is at the GE recommended HSE interval

Generator: Brush BDAX 7-290ERJT - 50.8 MW/ 63.5 MVA, 11,500v. 50 Hz. 0.8 P.F.

Gear Box: Lufkin NFVQ2419-D, ratio 1.209: 1

HRSG: DKME Korea DKS2107H01 - 52 t/hr. 103 barg, 313°C, single pressure, natural circulation

Gas Booster Compressors: 2X Ariel JGC/4 NGBC-A 97,280 Hrs., NGBC-B 5,800 Hrs.

Gas Circuit Breaker: ABB 4000A, 11 KV

Controls/Protection: Woodward, Mucronet Plus controller, Bently Nevada 3500 vibration monitoring

Inlet Air System: Eagle MERV 17, two-layer filtration with pulse-jet cleaning (Upgraded in 2024)

Additional Systems: CO2 Fire suppression, Siemens CEMS (Oxymat/Ultramat) Hydraulic, gas chromatograph spare parts inventory

Total Time: 98,153 hrs. / 486 starts. Hours since last engine replacement: 30,300 hrs. /98 starts

Hot Section Replacement as pre GE guidelines at 41,393

Power Plant is ready to be dismantled
GE LM6000 PD Sprint, 46MW, 11,500v. 50 Hz. Natural Gas Turbine-Generator
One (1) Complete Power Plant with an GE LM6000 PD Sprint, 46 MW ISO, 11,500v. 50 Hz. Cogeneration, Natural Gas Turbine Generator.

Equipment Description
Gas Turbine Generator Set: 2009 Manufactured/2021 engine exchanged - GE LM600 PD Sprint Triple annular combustor

Condition: Engine exchanged by GE in March 2021 with factory refurbished unit. Last GE borescope (Dec. 2024) released the engine for operations, nevertheless, the engine is at the GE recommended HSE interval

Generator: Brush BDAX 7-290ERJT - 50.8 MW/ 63.5 MVA, 11,500v. 50 Hz. 0.8 P.F.

Gear Box: Lufkin NFVQ2419-D, ratio 1.209: 1

HRSG: DKME Korea DKS2107H01 - 52 t/hr. 103 barg, 313°C, single pressure, natural circulation

Gas Booster Compressors: 2X Ariel JGC/4 NGBC-A 97,280 Hrs., NGBC-B 5,800 Hrs.

Gas Circuit Breaker: ABB 4000A, 11 KV

Controls/Protection: Woodward, Mucronet Plus controller, Bently Nevada 3500 vibration monitoring

Inlet Air System: Eagle MERV 17, two-layer filtration with pulse-jet cleaning (Upgraded in 2024)

Additional Systems: CO2 Fire suppression, Siemens CEMS (Oxymat/Ultramat) Hydraulic, gas chromatograph spare parts inventory

Total Time: 98,153 hrs. / 486 starts. Hours since last engine replacement: 30,300 hrs. /98 starts

Hot Section Replacement as pre GE guidelines at 41,393

Power Plant is ready to be dismantled
seller offer No. resale 162752950
can't update statistics 2