Gas generators MTU 8V 4000 L63

energy & engines: power generators, engines, turbines, boilers / power generators / Gas generators

Manufacturer: MTU

Model:8V 4000 L63

Type of machine: Gas generators

item-No.: 162722392

Quantity: 0

Date: 22.05.2025

Year of manufacture: 2013

Operating hours: 34000

Location: Land-uk United Kingdom

Price:


Machine in stock:Yes

Seller-item-No.:GEE1478

2 X MTU 8V 4000 L63 Trigeneration Plants

Hours: 34,000
Year: 2013
Fuel: NAT GAS
Control Panel: MTU
Capacity: 2 X 850kW
Voltage: 400
HZ: 50

Service History:
At 21,000 hours, major maintenance was performed relating to: pistons, liners, turbo overhaul, and intercooler replacement.
At 42,000 hours, another maintenance is scheduled identical to the 21,000-hour one + connecting rod replacement.
At 31,500 hours, the generator was overhauled with bearing replacement.
The exchange overhaul is scheduled at 63,000 hours.

STOPPED IN MARCH 2024

Scope of supply: Complete Trigeneration Plant.

The trigeneration plant consists of two endothermic engines fueled by methane gas, each having the following main characteristics :
• Chemical power input 2,130 kW
• Electrical power 849 kW
• Engine jacket heat recovery 511 kW at 78/90°C
• Diathermic oil boiler from exhaust 469 kW at 105/300°C
• NOx emissions 250 mg/Nm3

Overall, the plant is capable of producing :
• Electrical power 1,698 kW
• Thermal power at 90°C 1,022 kW
• Diathermic oil power 938 kW
• Cooling power (from absorber) 945 kW
Share this machine on Facebook:

Inquiry

Machinery dealer?

Please remit optionally

Send wanted inquiry?

Copy to you?

Save input data

2 X MTU 8V 4000 L63 Trigeneration Plants

Hours: 34,000
Year: 2013
Fuel: NAT GAS
Control Panel: MTU
Capacity: 2 X 850kW
Voltage: 400
HZ: 50

Service History:
At 21,000 hours, major maintenance was performed relating to: pistons, liners, turbo overhaul, and intercooler replacement.
At 42,000 hours, another maintenance is scheduled identical to the 21,000-hour one + connecting rod replacement.
At 31,500 hours, the generator was overhauled with bearing replacement.
The exchange overhaul is scheduled at 63,000 hours.

STOPPED IN MARCH 2024

Scope of supply: Complete Trigeneration Plant.

The trigeneration plant consists of two endothermic engines fueled by methane gas, each having the following main characteristics :
• Chemical power input 2,130 kW
• Electrical power 849 kW
• Engine jacket heat recovery 511 kW at 78/90°C
• Diathermic oil boiler from exhaust 469 kW at 105/300°C
• NOx emissions 250 mg/Nm3

Overall, the plant is capable of producing :
• Electrical power 1,698 kW
• Thermal power at 90°C 1,022 kW
• Diathermic oil power 938 kW
• Cooling power (from absorber) 945 kW

seller offer No. resale GEE1478
Share this machine on Facebook:
approved
dealer

Seller

logo dealer

Gas Engine Exchange Ltd

Mr Edward Dulake
0 LONDON
United Kingdom

RESALE member since 2016

  • machine list (134)

Inquiry

Machinery dealer?

Please remit optionally

Send wanted inquiry?

(to all dealers for such a machine)

Copy to you?

(copy of your inquiry will be sent to your email address)

Save input data

(Save input data for further inquiries)

can't update statistics 2